INDIA

PM Modi Unveils Mumbai Trans Harbour Link: India’s Longest Bridge On 12 Jan”24

Discover the grand inauguration of the Mumbai Trans Harbour Link by PM Modi. Explore the impact on connectivity and travel time reduction in India. Stay updated on the latest infrastructural milestones.

Unlocking Connectivity: PM Modi Inaugurates Mumbai Trans Harbour Link

In a momentous development for India’s infrastructure landscape, Prime Minister Narendra Modi is set to inaugurate the Mumbai Trans Harbour Link (MTHL), India’s longest sea bridge, on January 12. This monumental bridge, officially named Atal Bihari Vajpayee Sewari – Nhava Sheva Atal Setu, spans a remarkable 21.8 kilometers and comes with a host of benefits for the region.

Enhanced Connectivity and Travel Time Reduction

The Mumbai Trans Harbour Link is a six-lane bridge that encompasses a sea stretch of 16.5 kilometers and an additional 5.5 kilometers on land. With a total length of 21.8 kilometers, it is set to revolutionize connectivity between Mumbai, Navi Mumbai International Airport, and Mumbai International Airport. Commuters can anticipate reduced travel times to Pune, Goa, and South India, making this bridge a crucial infrastructural asset.

Key Features and Benefits

Faster Connectivity: The bridge offers expedited travel to and from Mumbai International Airport and Navi Mumbai International Airport.

Reduced Travel Time: Motorists can experience significantly reduced travel time to Pune, Goa, and South India.

Financial Aspect: Commuters will be required to pay a toll of ₹250 for a one-way trip.

PM Modi’s Day-Long Maharashtra Visit

Prime Minister Modi’s visit to Maharashtra on January 12 is packed with significant events. The day kicks off in Nashik, where PM Modi inaugurates the 27th National Youth Festival. Following this, he will be in Mumbai, commencing the official inauguration of the Atal Setu, part of the Mumbai Trans Harbour Link.

Landmark Projects Worth ₹30,500 Crore

During his visit, PM Modi is set to inaugurate, dedicate to the nation, and lay the foundation stone for projects collectively valued at ₹30,500 crore. This includes the Mumbai Trans Harbour Link, an ambitious project named after the late Atal Bihari Vajpayee.

Major Highlights of PM Modi’s Visit

Atal Setu Inauguration: PM Modi will formally inaugurate the Atal Setu, marking the commencement of the Mumbai Trans Harbour Link.

Public Program in Navi Mumbai: A public program in Navi Mumbai will witness the inauguration, dedication, and foundation stone-laying of development projects exceeding ₹12,700 crore.

Empowerment Initiatives: PM Modi will launch the Namo Mahila Shashaktikaran Abhiyaan, focusing on empowering women through skill development and entrepreneurship.

Infrastructural Milestones

Apart from the Mumbai Trans Harbour Link, PM Modi will lay the foundation stone for an underground road tunnel connecting the eastern freeway’s orange gate to Marine Drive. The 9.2km tunnel is estimated to cost over ₹8,700 crore. Additionally, he will dedicate phase 1 of the Surya regional bulk drinking water project, a significant step in water resource management.

Positive Economic Impact

The Mumbai Trans Harbour Link is not only a feat in engineering but also promises positive economic ramifications. By improving connectivity to major airports and reducing travel time to key destinations, this bridge is poised to stimulate economic growth and enhance regional development.

Prime Minister Narendra Modi’s visit to Maharashtra is poised to be a landmark occasion, symbolized by the inauguration of the Mumbai Trans Harbour Link. This strategic infrastructural marvel is set to redefine connectivity in the region, bringing about a positive impact on travel times and economic growth. Stay tuned for updates on this monumental inauguration, marking a new era in India’s infrastructural prowess. Explore how this bridge sets the stage for a more connected and prosperous future.

Also Read: Maldives vs Lakshadweep: Tourism Fallout as Boycott Gains Momentum

Leave a Reply

Your email address will not be published. Required fields are marked *